How to Quote Kitchen Renovation Jobs

A practical quoting guide for Australian builders and renovation contractors. Covers demolition, cabinetry, benchtops (including the engineered stone ban), plumbing, electrical, splashbacks, appliance allowances, common job benchmarks, council and licensing requirements by state, and how to present kitchen quotes that win work and protect your margin.

Why kitchen renovation quoting is the highest-stakes room in the house

Kitchens involve more trades, more material decisions, and more customer emotion than any other room. A bathroom has one benchtop, one splashback, and a wet area. A kitchen has cabinetry across three or four walls, a benchtop with cutouts and joins, plumbing for the sink and dishwasher, electrical for a dozen power points and the rangehood, a splashback that ties the room together, flooring that transitions into the living area, and appliances worth $3,000 to $15,000 that the customer has been researching for months.

The builders who profit from kitchen work quote every one of those layers as a separate line item. The ones who struggle lump everything into a round number, absorb the demolition and electrical costs to keep the headline figure competitive, and then discover they have no margin left when the plumber finds galvanised pipes behind the wall.

This guide covers each component with real 2026 Australian benchmarks so you can build profitable kitchen quotes on every job.

Step 1: Calculate your true cost per hour

Before pricing any kitchen job, work out what an hour of your time actually costs the business. This is your loaded hourly cost, covering everything required to have your crew on site with tools ready.

Cost component Typical annual range (sole operator or small crew)
Wages (including your own draw)$70,000 - $110,000
Superannuation (12%)$8,400 - $13,200
Vehicle (lease, fuel, rego, maintenance)$12,000 - $22,000
Insurance (public liability, construction, tools)$4,000 - $10,000
Tools and equipment$3,000 - $6,000
Licensing and training (builder's licence, CPD)$500 - $2,000
Accounting, software, phone, admin$3,000 - $6,000
Workers comp (if employing)$4,000 - $12,000
Home indemnity insurance (required in most states for renos over $12K-$20K)$1,500 - $5,000

For a sole operator with one labourer, total annual costs typically land between $120,000 and $190,000. At 1,600-1,700 billable hours per year (allowing for quoting time, travel, admin, and holidays), your loaded cost per hour sits between $70 and $120.

Kitchen work is indoor, so rain delays are rare, but lead-time gaps between trades (waiting for the plumber, waiting for the electrician, waiting for cabinets) can leave your crew idle. Schedule trades tightly and price dead time into your overheads rather than absorbing it on each job.

Step 2: Assess and price the demolition

Every kitchen renovation starts with removing what is already there. The demolition scope sets the baseline cost that every other line item builds on.

Kitchen demolition costs (2026)

Item Cost range Notes
Cabinet-only removal$800 - $1,500Wall and base cabinets, benchtop, sink disconnection
Full kitchen strip-out$1,500 - $4,000Cabinets, benchtop, splashback, flooring, wall patching
Full strip-out including flooring removal$2,500 - $5,500Tiles, vinyl, or timber removed to subfloor
Skip bin (4-6 m3)$300 - $600Standard kitchen demolition waste volume
Asbestos removal (if found)$2,500 - $15,000Licensed removal required; see below

The asbestos question

Any home built before 1990 (and some built up to the mid-1990s) may contain asbestos in splashback sheeting, vinyl flooring, wall and ceiling sheeting, or insulation behind the oven. You are legally required to have an asbestos assessment done before demolition work on pre-1990 properties. If asbestos is found, a licensed asbestos removalist must handle the material. Removal costs $50-150 per square metre for bonded (non-friable) asbestos, with a minimum charge of $1,500-2,500 for most contractors.

Include a provisional sum or exclusion clause in your quote for asbestos in older homes. A line reading "Excludes asbestos removal. If asbestos-containing materials are found during demolition, removal will be quoted separately by a licensed removalist" protects both you and the customer.

Step 3: Price the cabinetry

Cabinetry is the largest single cost in most kitchen renovations, typically 30-40% of the total project. The gap between flat-pack and fully custom joinery can be $15,000 to $30,000 on the same footprint. A standard kitchen runs 6-8 linear metres of cabinetry (base units, wall units, and a pantry or tall unit).

Cabinetry costs by type (per linear metre, installed)

Cabinetry type Cost per linear metre (installed) Door finish Typical total (7 lm kitchen)
Flat-pack (Kaboodle, Bunnings, IKEA)$200 - $450Melamine wrap$1,400 - $3,150
Semi-custom (local manufacturer)$450 - $900Melamine or vinyl wrap$3,150 - $6,300
Custom joinery (melamine or vinyl wrap)$900 - $1,500Melamine, vinyl, or laminate$6,300 - $10,500
Custom joinery (two-pack polyurethane)$1,500 - $2,200Two-pack spray finish$10,500 - $15,400
Custom joinery (Shaker profile or solid timber)$1,800 - $2,800+Shaker, timber veneer, or solid timber$12,600 - $19,600+

Flat-pack cabinets require 1-2 days of assembly labour (for a standard kitchen) on top of the unit cost. Factor this into your quote at your crew rate. Semi-custom and custom cabinets arrive assembled or part-assembled, reducing on-site labour but shifting cost into the cabinet supply price.

Cabinet hardware (hinges, drawer runners, pull-out bins, lazy susans, spice racks) adds $500-2,500 depending on quality. Soft-close hardware is now standard on anything above flat-pack. Specify the hardware brand and level in your quote.

Cabinet lead times

Type Lead time
Flat-pack (off the shelf)Available immediately or 1-2 weeks delivery
Semi-custom3-5 weeks
Fully custom joinery4-10 weeks

Lead times drive project scheduling. If cabinets take 8 weeks, demolition cannot start until week 6 at the earliest (assuming 2 weeks for demo, plumbing rough-in, electrical rough-in, plastering, and painting before cabinets arrive). Communicate lead times to the customer in your quote and build them into the project timeline.

Step 4: Quote the benchtop

Benchtops are the second largest material cost and the surface the customer will touch and see every day. The engineered stone ban has changed the benchtop conversation in Australia since mid-2024.

The engineered stone ban

On 1 July 2024, Australia banned the manufacture, supply, and installation of engineered stone products containing crystalline silica. On 1 January 2025, importation was also banned. This covers the brands that dominated the market for 15 years (Caesarstone, Smartstone, Essastone, and similar). The ban is a workplace health and safety measure to prevent silicosis in stonemasons and fabricators.

Low-silica engineered stone alternatives have entered the market from some manufacturers. These are compliant and available at similar price points. Natural stone (granite, marble, quartzite), porcelain slabs, laminate, timber, concrete, and stainless steel are all unaffected by the ban.

Benchtop costs by material (per sqm, supply and install)

Material Cost per sqm (installed) Best for Watch out for
Laminate (post-formed)$120 - $330Budget renovations, rentalsLimited edge profiles, heat damage from hot pans
Low-silica engineered stone$450 - $1,000Mid-range to premium, uniform lookConfirm product is compliant with the ban; request supplier certification
Granite$700 - $1,500Premium, natural variation wantedSealing required, heavy (structural check for islands)
Marble$900 - $2,000Luxury, statement kitchensEtches from acids (lemon, vinegar), regular sealing
Porcelain slab$500 - $1,200Modern, thin-profile lookHarder to fabricate; specialist installers needed
Timber (hardwood, oiled)$500 - $1,600Warm, natural aestheticRequires regular oiling, can mark from water rings
Concrete (polished)$600 - $1,200Industrial or rustic lookMust be sealed, can crack if substructure moves
Stainless steel$800 - $1,500Commercial-style kitchensScratches easily, fingerprints

A typical kitchen benchtop area is 2.5-5 square metres (L-shape or U-shape with island). Cutouts for sinks and cooktops add $100-300 each. Edge profiles (waterfall ends, bullnose, mitred) add $50-150 per lineal metre on stone benchtops. Specify the exact material, thickness, edge profile, and number of cutouts in your quote.

Step 5: Price the plumbing

Kitchen plumbing covers the sink, tap, dishwasher connection, and (if applicable) gas line for the cooktop. Whether services stay in the same location or move to a new position makes a large difference to cost.

Kitchen plumbing costs (2026)

Item Cost range Notes
Sink replacement (same location)$250 - $500Labour only; customer supplies sink
Tap installation$150 - $350Labour only; mixer tap standard
Dishwasher connection$150 - $300Hot, cold, and waste connections
Complete plumbing (same location)$1,500 - $2,500Rough-in and fit-off, no relocation
Complete plumbing (relocated services)$2,500 - $4,000Pipe extensions for new sink or dishwasher position
Gas line for cooktop$400 - $1,200From existing gas supply point; new run from meter adds more
Plumbed fridge connection$200 - $500Water line for ice maker or filtered water

Always subcontract plumbing to a licensed plumber and include their quote as a line item. Do not absorb plumbing into a round "trades" figure. If the customer changes the sink position during the build, the plumbing cost changes significantly. A clear line item makes variations easy to price and justify.

Step 6: Price the electrical

Kitchen electrical is often underquoted. A modern kitchen requires more circuits and power points than most other rooms in the house, and the existing wiring in an older home may not be compliant.

Kitchen electrical costs (2026)

Item Cost range Notes
Power point installation (each)$140 - $200Supply and install, standard double GPO
Oven circuit (dedicated 20A or 32A)$300 - $600Required for most wall ovens and freestanding cookers
Cooktop circuit (dedicated 32A)$350 - $700Induction cooktops draw 6-8 kW; some need 40A
Rangehood wiring and switch$200 - $450Includes ducting penetration if external
Under-cabinet LED lighting$400 - $1,200Strip LED with driver; length dependent
Pendant lighting (per pendant)$150 - $350Supply, wire, and install; excluding fitting cost
Downlight installation (per light)$70 - $130LED downlight supply and install
Switchboard upgrade$1,200 - $3,500If existing board lacks capacity for new circuits
Complete kitchen electrical (basic upgrade)$1,500 - $3,5006-10 GPOs, lighting, oven circuit, existing board OK
Complete kitchen electrical (full rewire)$3,500 - $8,000New circuits, switchboard upgrade, induction, lighting design

Induction cooktops are increasingly popular in Australian kitchen renovations. A high-powered induction cooktop (7.2-8.4 kW) needs a dedicated 32A or 40A circuit. If the existing switchboard is full, a switchboard upgrade is required before the electrician can add new circuits. Include a provisional sum for switchboard work in your quote for older homes.

Step 7: Price the splashback

The splashback covers the wall between the benchtop and wall cabinets, plus the area behind the cooktop. A typical kitchen splashback area is 2-5 square metres.

Splashback costs by material (per sqm, installed)

Material Cost per sqm (installed) Notes
Ceramic subway tiles$80 - $180Most popular option; classic look, easy to source
Porcelain tiles$100 - $250Harder and more water-resistant than ceramic
Mosaic tiles$150 - $350Feature areas; complex grouting increases labour
Large-format porcelain$200 - $400Fewer grout lines, modern look; needs experienced tiler
Toughened glass (back-painted)$250 - $750Seamless look, any colour; cutouts for power points add cost
Mirror glass$300 - $700Makes small kitchens feel larger; shows every mark
Pressed metal$100 - $250Heritage or industrial look; limited colour range
Stone slab (matching benchtop)$500 - $1,500Seamless bench-to-splash look; heavy, needs strong fixing

Glass splashbacks require a site measure after the cabinets and benchtop are installed, adding a second visit for the glazier. Factor this into your project schedule. Tile splashbacks can be installed before or after cabinets depending on the design, but most kitchen tilers prefer to tile after cabinets are in place for a cleaner finish line.

Step 8: Price the flooring

Kitchen flooring needs to handle water, dropped items, and heavy foot traffic. A typical kitchen floor area is 8-15 square metres. Many renovations include the adjoining dining or living area for a seamless transition.

Kitchen flooring costs (per sqm, installed)

Material Cost per sqm (installed) Notes
Vinyl plank (click-lock)$50 - $120Waterproof, soft underfoot, fast install
Porcelain floor tiles$80 - $200Durable, waterproof; cold underfoot without heating
Ceramic floor tiles$60 - $150Budget-friendly; less durable than porcelain
Engineered timber$90 - $200Real timber look; not ideal near dishwashers without protection
Polished concrete$50 - $100Usually existing slab; grind, seal, and polish
Natural stone tiles$150 - $400Premium look; requires sealing

Old flooring removal adds to the demolition cost. Tiles on a concrete slab cost $25-50 per sqm to remove. Vinyl or timber over timber subfloor is faster at $10-25 per sqm. If the existing floor is level and sound, some materials (vinyl plank, engineered timber) can be installed directly over the top, saving removal costs.

Step 9: Handle appliances clearly

Appliances are the most common source of kitchen quote disputes. Be explicit about who is supplying them and what your installation allowance covers.

Two approaches

Customer-supplied appliances: The customer buys their own oven, cooktop, rangehood, and dishwasher. You include an installation allowance per appliance ($100-300 each). This keeps your quote lower and avoids warranty responsibility for the appliances. State clearly in your quote: "Appliances to be supplied by the client. Installation allowance of $X per appliance is included. Appliances must be on site before the scheduled installation date."

Builder-supplied appliances: You source the appliances, mark them up 10-20%, and include them as line items. This gives you control over the schedule (no waiting for the customer's delivery) and adds margin. Specify the exact make, model, and price for each appliance. If the customer changes their mind after you have ordered, your quote should include a restocking or cancellation clause.

Typical appliance installation costs (labour only)

Appliance Installation cost Notes
Wall oven$150 - $300Electrician required for hardwiring
Cooktop (electric/induction)$150 - $250Electrician required; benchtop cutout by fabricator
Cooktop (gas)$200 - $400Licensed gasfitter required
Rangehood$150 - $350Ducted adds penetration and ductwork cost
Dishwasher$100 - $200Plumber for water and waste connections
Microwave (built-in)$100 - $200Trim kit and power point required

Step 10: Include painting, plastering, and finishing

After demolition, plumbing and electrical rough-in, and before cabinet installation, the walls and ceiling need patching and painting. This step is often underquoted or forgotten entirely.

Item Cost range Notes
Wall patching and plastering (kitchen area)$500 - $1,500After old cabinet removal; depends on wall condition
Ceiling repair (if water damage or removal of bulkhead)$300 - $1,000Plasterboard and skim coat
Painting (walls and ceiling, kitchen area)$800 - $2,000Prep, 2-3 coats; Dulux Wash&Wear or similar kitchen-grade paint
Cornice and trim replacement$200 - $600If damaged during demolition or replacing bulkhead

Common kitchen renovation benchmarks (2026)

These benchmarks cover complete renovations including demolition, all trades, and clean-up. They exclude appliances (customer-supplied) and assume services remain in the same location.

Small kitchen (5-8 sqm, galley or single-wall, apartment or unit)

Component Budget Mid-range Premium
Demolition and waste$1,200$1,800$2,500
Cabinetry (4-5 lm)$1,500$4,000$10,000
Benchtop (2-3 sqm)$400$2,000$4,500
Plumbing$1,200$1,800$2,500
Electrical$1,200$2,500$4,000
Splashback (2-3 sqm)$300$600$2,000
Flooring (5-8 sqm)$400$1,000$2,400
Painting and plastering$800$1,200$1,800
Clean-up$300$400$500
Subtotal (ex GST, ex margin)$7,300$15,300$30,200
With 35% margin + GST$12,340$25,890$51,070

Standard kitchen (10-15 sqm, L-shape or U-shape, typical house)

Component Budget Mid-range Premium
Demolition and waste$1,800$2,500$3,500
Cabinetry (6-8 lm)$2,500$6,500$18,000
Benchtop (3-5 sqm)$700$3,500$8,000
Plumbing$1,500$2,200$3,500
Electrical$1,500$3,000$6,000
Splashback (3-5 sqm)$400$900$3,000
Flooring (10-15 sqm)$700$1,800$4,500
Painting and plastering$1,000$1,500$2,500
Clean-up$400$500$600
Subtotal (ex GST, ex margin)$10,500$22,400$49,600
With 35% margin + GST$17,770$37,880$83,910

Large kitchen (15-25 sqm, island, open-plan, large house)

Component Mid-range Premium
Demolition and waste$3,000$5,000
Cabinetry (10-14 lm incl. island)$10,000$35,000
Benchtop (5-8 sqm incl. island)$5,000$14,000
Plumbing (dual sink or prep sink on island)$3,000$5,000
Electrical$4,000$8,000
Splashback (5-8 sqm)$1,500$5,000
Flooring (15-25 sqm)$2,500$7,500
Painting and plastering$2,000$3,500
Clean-up$600$800
Subtotal (ex GST, ex margin)$31,600$83,800
With 35% margin + GST$53,440$141,730

Council approvals and compliance

Most like-for-like kitchen replacements (same layout, same services, no structural changes) do not require council approval. However, several common kitchen renovation scenarios do trigger approval requirements.

When council approval is typically required

  • Removing or modifying a load-bearing wall (opening up to a dining area) requires a structural engineer's certificate and council approval in all states.
  • Changing the building footprint (extending the kitchen into a courtyard, closing in a verandah) is regulated building work in every state.
  • Relocating plumbing to a position outside the existing wet area may require hydraulic design certification.
  • Heritage overlays can restrict even cosmetic changes in listed homes or heritage precincts.

Compliance costs

Item Cost range
Structural engineer's report (wall removal)$500 - $2,000
Council development application (minor works)$200 - $1,500
Private certifier (complying development certificate)$1,000 - $3,000
Building surveyor final inspection$300 - $800
Asbestos survey (pre-demolition, pre-1990 homes)$300 - $800

Include council fees in your quote as a separate line item. If the scope of work might trigger an approval requirement, note it as a provisional item with an estimated cost rather than leaving it out entirely.

Licensing requirements by state

Builder licensing in Australia is managed by each state and territory separately. The thresholds, licence classes, and insurance requirements differ.

State/Territory Licence required above Regulator Key notes
NSW$5,000 (incl. GST)NSW Fair TradingSpecific Kitchen, Bathroom & Laundry Renovation licence class available
VICAll structural workVBARegistered Building Practitioner required; separate KBL licence class
QLD$3,300 (incl. labour + materials)QBCCLowest threshold in Australia
WA$20,000Building Commission WAHighest mainland threshold; HIA not required under $20K
SA$5,000 (prescribed work)Consumer & Business Services SABuilding work contractor licence + $10K net assets + PL insurance
TASAll building workCBOS TasmaniaRegistered building practitioner required regardless of value
ACT$5,000Access CanberraCabinet makers exempt from trade licence; builder licence needed for overall project
NT$12,000NT Building Advisory ServicesRegistered building practitioner for work above threshold

Regardless of the builder licence threshold, plumbing work always requires a licensed plumber, electrical work always requires a licensed electrician, and gas work always requires a licensed gasfitter. These are separate licences from the builder's licence.

Home indemnity insurance (also called home warranty insurance) is required in most states for residential renovation work above certain thresholds (typically $12,000-$20,000). Check your state's requirements and factor the premium into your overheads.

Regional price variation across Australia

Kitchen renovation costs vary by city due to differences in labour rates, trade availability, and property values.

City Relative cost (national average = 100) Notes
Sydney110 - 115Most expensive market; high labour rates and strong demand
Melbourne105 - 110Second highest; competitive trade market
Brisbane100 - 105Close to national average; growing demand
Perth100 - 105Trade shortages can push prices higher on complex jobs
Canberra105 - 110Small market with strong purchasing power; fewer trades available
Adelaide90 - 95Below national average; competitive pricing
Hobart90 - 95Lower labour costs offset by limited trade availability
Darwin105 - 115Supply chain costs and climate factors add to pricing
Regional/rural95 - 120Wide range; travel costs and trade scarcity drive upper end

Regional and rural areas have a wider cost range because travel time and limited trade availability can push costs 10-20% above metro rates, while lower overheads and land costs pull some components down. Always price for your local market rather than using national averages.

Worked example: mid-range L-shape kitchen renovation in Melbourne

A homeowner in Melbourne's inner east wants to renovate their 12 sqm L-shape kitchen. The home was built in 1985 (asbestos survey required). The layout stays the same. Cabinetry is semi-custom with vinyl-wrap doors. Benchtop is low-silica engineered stone. Subway tile splashback. Vinyl plank flooring. Customer supplies appliances.

Line item Qty / scope Cost (ex GST)
Asbestos surveyPre-demolition inspection$500
Demolition and strip-outFull kitchen, waste removal$2,200
Skip bin hire4 m3$400
Cabinetry (semi-custom, vinyl wrap, soft-close)7 lm base + wall + pantry$5,600
Cabinet hardware upgrade (pull-out bins, lazy susan)Lump sum$800
Benchtop (low-silica engineered stone, 20mm, square edge)3.5 sqm$2,800
Benchtop cutouts (sink + cooktop)2 cutouts$400
Splashback (white subway tiles, 300x75mm)3.5 sqm$490
Plumbing (sink, tap, dishwasher, same location)Rough-in + fit-off$1,800
Electrical (8 GPOs, oven circuit, cooktop circuit, rangehood, under-cabinet LEDs, 4 downlights)Complete kitchen electrical$3,200
Flooring (vinyl plank over existing subfloor)12 sqm$1,080
Wall plastering and patchingAfter old cabinet removal$900
Painting (walls and ceiling, 2 coats kitchen-grade)Kitchen area$1,200
Appliance installation (oven, cooktop, rangehood, dishwasher)4 appliances, customer-supplied$800
Final cleanLump sum$400
Subtotal (direct costs)$22,570
Builder's margin (35%)$12,153
Subtotal before GST$34,723
GST (10%)$3,472
Total price (inc GST)$38,195

This falls within the national mid-range benchmark ($25,000-$45,000 inc GST) and the Melbourne regional adjustment (5-10% above national average). The 35% margin yields $12,153 gross profit on this job, from which the builder covers overhead costs before net profit.

If the asbestos survey finds asbestos in the splashback sheeting, add $1,500-3,000 for licensed removal. If the switchboard needs upgrading, add $1,500-3,000. Both are noted as exclusions in the quote with estimated costs for customer awareness.

7 common kitchen quoting mistakes

  1. Absorbing demolition costs. Demolition and waste removal cost $1,500-5,500 on a full kitchen strip-out. Rolling this into a round number hides a real cost that the customer should see and understand.
  2. Underquoting electrical. Kitchens need more circuits, more power points, and often a switchboard upgrade that older homes do not have capacity for. Budget $1,500-8,000 for electrical, not $500.
  3. Forgetting the engineered stone ban. Quoting a benchtop material that is banned wastes your time and the customer's. Specify compliant materials from the start.
  4. Leaving appliances ambiguous. "Appliances not included" is not enough. State whether your quote includes installation labour for customer-supplied appliances, and if so, how many and what type.
  5. Ignoring cabinet lead times. Custom cabinets take 4-10 weeks. If your project timeline does not account for this, you have dead time on site (costing you) or overlap problems with other trades.
  6. No provisional sum for concealed conditions. Old houses hide surprises: asbestos, non-compliant wiring, rotted framing, missing noggings. A provisional sum or exclusion clause protects your margin.
  7. Confusing markup with margin. A 30% markup gives you a 23% margin. If your target is a 35% gross margin, your markup needs to be 54%. Track actual margins by back-costing every completed kitchen against the original quote.

Frequently asked questions

How much does a kitchen renovation cost in Australia in 2026?

A cosmetic refresh (new doors, benchtop, splashback, paint) costs $8,000-20,000. A mid-range full renovation with semi-custom cabinetry and stone benchtops costs $25,000-45,000. A premium custom kitchen costs $45,000-100,000 or more. The national median for a complete kitchen renovation is around $35,000 in 2026. Costs vary significantly by city, kitchen size, and material selections.

What is the biggest cost in a kitchen renovation?

Cabinetry is the single largest component, typically 30-40% of the total. For a $35,000 mid-range renovation, expect $10,000-14,000 on cabinetry alone. Benchtops are second at 10-15%, followed by appliances at 10-15%, and plumbing plus electrical combined at 10-15%.

Can I still use engineered stone for kitchen benchtops?

Traditional engineered stone containing crystalline silica was banned from manufacture, supply, and installation in Australia from 1 July 2024, and from importation on 1 January 2025. Low-silica alternatives from some manufacturers remain compliant and available at similar price points ($450-1,000 per sqm installed). Natural stone, porcelain slabs, laminate, timber, and stainless steel are all unaffected.

Do I need a builder's licence for kitchen renovations?

It depends on your state. NSW requires a licence for work over $5,000 (GST inclusive). Queensland requires one for work over $3,300. Victoria requires registration for structural work at any value. WA has the highest mainland threshold at $20,000. Plumbing and electrical always require separately licensed tradespeople regardless of the overall project value.

How long does a kitchen renovation take?

A cosmetic refresh takes 1-2 weeks. A mid-range full renovation takes 4-8 weeks from demolition to final clean. A high-end custom kitchen takes 8-16 weeks, with 4-8 weeks of cabinet manufacture lead time. Schedule trades tightly and communicate lead times to the customer from the start.

Should I quote fixed price or cost-plus?

Fixed-price quoting is standard for kitchen renovations in Australia and is legally required in most states for domestic work above certain thresholds. The key to profitable fixed-price work is thorough scoping before you price. Include provisional sums or exclusion clauses for concealed conditions (asbestos, non-compliant wiring, rotted framing) to protect your margin on unknowns.

What margin should I target on kitchen renovations?

Target a gross profit margin of 30-40%. A 35% gross margin on a $40,000 kitchen yields $14,000 in gross profit, from which you cover your fixed overheads before net profit. If your actual margins consistently fall below 25%, tighten your scoping or pricing process. Back-cost every completed job against the original quote to track real margins.

How long should it take to prepare a kitchen renovation quote?

A straightforward like-for-like kitchen replacement takes 2-4 hours after a site visit. A complex renovation with layout changes, structural work, and custom joinery takes 4-8 hours. FlowSpec cuts quoting time by letting you speak your line items on site and sending the priced quote to Xero automatically.